new track calculation load time
the new track calculation are neat and stuff but, how is it actually calculated?
what i've been experiencing is, the calculation time are long, and stupid long if the track is also stupid long.
i mean 2mins+ for just 1 time calculation in the green hell. even on the automation test track it takes about 10 secs.
is it calculated using only a single processor thread? if it does.... then i'm pretty screwed
running it on a 4yo amd laptop doesnt help either
btw my specs are
AMD A6-3420m (amd first APU, 2 modules, 4 cores@ 1.5Ghz) with 4GB RAM