Model year versus Engineering time
How does model and technology year match up with engineering time? For example, a 2015 model with a 5 year engineering time, does that mean you start engineering at 2015 and release at 2020, or that you plan to release at 2015 and thus have to start the process in 2010 and hope the deadline holds, or is it something else entirely?